Future Clean Energy facility management project in Benban at ENERRAY's 50KWp solar development
Scope of work
• Fixed the main gate.
• Reconstruction of roads.
- Stabilized pavement material:
Laid base preparation with mechanical compaction of the ground. On top of the suitable sub-grade, a layer of filling material consisting of gravel or crushed rocks was placed.
• Repaired tracker system by using suitable cold galvanization methods:
- Mechanical cleaning using wire brush.
- Application of zinc rich paint such as Jotamastic 90 Aluminum or equivalent approved by owner. This should be applied by spray or brush method.